YEAR REF COMPANY SHAFT or OPERATION MINING INDUSTRY  DESCRIPTION
2018 BIECON/18/04 Sibanye-Stillwater Ikamva shaft Gold Determining the new decline station layout and facility requirements between current and new designs for 46- and 47-level.
2018 BIECON/18/05 Sibanye-Stillwater Ikamva shaft Gold De-bottlenecking of the decline development waste rock handling while sinking the new decline.
2017 BIECON/17/32 Kankola Copper mines Kankola 4 shaft Copper A comprehensive logistic study on rock, personnel and material for the Konkola 4 shaft PFS study.  The simulation study results identified enormous shortcomings in the logistics of the mine, whicg warrant reviewing the mining schedules and sequences.
2017 BIECON/17/31 Sibanye-Stillwater Beatrix 2 plant Gold A surface trucking and screening plant simulation to identify the capability of the contractor rock handling system.
2017 BIECON/17/30 Sibanye-Stillwater Beatrix 3 shaft Gold A technical simulation study determining the operational impact of installing proximity detection systems (PDS) on horizontal underground tramming equipment.  PDS systems have recently becoming a non-negotionable requirement in the mining industry to eliminate underground accidents.
2017 BIECON/17/27 AngloGold Ashanti Vaal River surface  Gold AngloGold Ashanti Vaal River operations have a complex supply strategy from shafts or dumps to plants.  A comprehensive simulation study evaluated all apects to find the most optimised supply transportation system.
2017 BIECON/17/25 Modikwa mine Modikwa North shaft Platinum An evaluation of waste handling equipment for access development  on the new production levels of the mine identified the preferred conveyor equipment and showed shortcomings in the development cycles.
2017 BIECON/17/17 SibanyeGold Beisa 4 shaft Gold A simulation study provided insight on tramming procedures and the equipment quantities for 19-level.
2017 BIECON/17/16 SibanyeGold Hlanganani shaft Gold The study demonstarated the true capacities of four production levels on the shaft considering the current and improved tramming strategies.
2017 BIECON/17/15 Goldfields South Deep mine Gold  
2017 BIECON/17/12 Goldfields South Deep mine Gold A comprhensive logistic study of the Twin shaft and horizontal transportation of personnel confirms the shaft's ultimate service capacity and face shift availability.
2017 BIECON/17/10 AngloGold Ashanti Great Noligwa shaft pillar Gold A logistic study for the PFS to evaluate the shaft capacities and horizontal tramming capaities for the project.
2017 BIECON/17/09 Goldfields South Deep mine Gold A desktop study on how to change the shift arrangements for the shaft's continiuos operations into a modern and effective shift system.
2017 BIECON/17/08 Worley Parsons Wafi Golphu mine Copper A comprehensive logistic study simulation of the FS indicating the critical logistic components, which were reviewed in an updated study.
2017 BIECON/17/05 AngloGold Ashanti Moab Khotsong mine Gold A time and motion study on backfill placing processes.
2017 BIECON/17/02 Implats 16 shaft Platinum Rock flow simulation study considering alternative transferring and cross tramming strategies for Impala 16 shaft.  The study also evaluated the maximum hoisting abaility with shaft ore pass failures.
2016 BIECON/16/36 Implats 16 Shaft Platinum A simulation study of a typical Merensky and UG2 reef railine, demonstrating the maximum stoping outputs for a half level production principle.
2016 BIECON/16/34 SibanyeGold Hlanganani shaft Gold A logistic study for the FS desining the decline systems for mining below 50-level.  The study demonstarated the shaft capacities of existing shafts to handle the future mine extension.
2016 BIECON/16/31 AngloGold Ashanti Moab Khotsong mine Gold A comprehensive logistic study for the Growth PFS on Moab Khotsong mine, accessing the Zaaiplaats II area multiple shafts (small winder concepts)
2016 BIECON/16/30 AngloGold Ashanti VR Region Gold An optimisation study looking into scoring face time by implementing additional and more effective travelling and transportation stategies.  The study measured existing travelling of production crews to validate the actual face times for two shafts.
2016 BIECON/16/29 AngloGold Ashanti Kopanang mine Gold A shaft logistic study evaluating the possibility to put one of two personnel and material winders on a care and maintenance program.
2016 BIECON/16/26 AngloGold Ashanti Siguiri Gold mine Gold A comprehnsive simulation of the mine's load and haul production schedule to existing and the additional surface ROM pads, crusher circuits and stockpiling strategies.  The study evaluated the life of mine outputs of the milling plant with a 12Mtpa production capacity.
2016 BIECON/16/25 AngloGold Ashanti Surface rail Metallurgical  Gold AngloGold Ashanti Vaal River operations have a complex supply strategy from shafts or dumps to plants.  A comprehensive simulation study evaluated all apects to find the most optimised supply transportation system.
2016 BIECON/16/16 Implats 16 Shaft Platinum A logistic gap analysis of all the logistic systems of the operation.  Significant additionations and changes were recommended during the build-up startegy after it becomes clear that a logistic gap between design and installation is evident.
2016 BIECON/16/15 AngloGold Ashanti Moab Khotsong mine Gold A comprehensive logistic study for the Growth PFS on Moab Khotsong mine, accessing the Zaaiplaats II area multiple shafts (small winder concepts).
2016 BIECON/16/12 IMPALA 20 Shaft Platinum A comprehensive logistic study of the mine during the build-up of the production.
2016 BIECON/16/10 AngloGold Ashanti Moab Khotsong mine Gold A fact finding analysis of the vertical shaft activities during personnel and material handling.  The study demonstrated the impact of changes in the material supply strategy of the mine, and benchmarked these changes on the companies other operations searching for the same effect.
2016 BIECON/16/06 Bokoni Seekoegat project Platinum A conceptual study of the Seekoegat project logistics.
2016 BIECON/16/05 AngloGold Ashanti VR Region Gold Time and motion studies on three of AngloGold Ashanti operations.  The study determined the real factors for lost blasts and measured the actual time available for conducting productive work in stope faces.
2015 BIECON/15/27 Wesizwe Bakubung mine Platinum A simulation study of the shaft kibble hoisting phase during development of the mine.  The study showed the impact of extra activities on the advance rate of the mine.
2015 BIECON/15/25 SibanyeGold Beatrix North shaft Gold A logistic simulation study for the PFS to consider the five level production design of the project below 26-level.
2015 BIECON/15/23 AngloGold Ashanti Savuka mine Gold A trucking simulation of the West Wits complex reef from three operations to two plants using public roads and definite safety strategies.
2015 BIECON/15/22 AngloGold Ashanti Moab Khotsong mine Gold A simulation study of the mine's high production sfere using ore transfer and cross tramming strategies.
2015 BIECON/15/21 AngloGold Ashanti Kopanang mine Gold A logistic simulation study of opening an inter-level,accessing with a decline and existing horizontal level, producing high volumes reef.
2015 BIECON/15/19 Modikwa North/South1 Platinum Evaluating the effectiveness of the compressed air system of the mine.  The study marked all leakages and produced an action list with a repair program according severity of the leakage.  The study recommended pipe changes to overcome the undesirable pressure situation in stopes far from the compressed air source.
2015 BIECON/15/16 AngloGold Ashanti Mponeng mine Gold A comprhensive logistic study of the below 120 phase 3 decline PFS.  The study simulated the development and steady state production phases of the decline.
2015 BIECON/15/14 AngloGold Ashanti Siguiri Gold mine Gold A comprehnsive simulation of the mine's load and haul production schedule to existing and the additional surface ROM pads, crusher circuits and stockpiling strategies.  The study evaluated the life of mine outputs of the milling plant with a 12Mtpa production capacity.
2015 BIECON/15/13 Lonmin Engineering Services Platinum Investigating the existing bus routes for the Lonmin Marikana complex.  The study aims to align the bus routes with the demand from all the shaft and decline operations and make provision for public usage of the Maikana community.
2015 BIECON/15/12 RSVSA Palabora Copper Copper A comprehensive logistic study for the PFS and FS for the Lift II project.  The study used continious improvement principles to succesfully implement monitoring of outputs.  
2015 BIECON/15/04 Impala 20 shaft  Platinum A benchmarking study considering all types of drill rigs used on the Impala operations.  Time and Motion studies on 16 shaft, 20 shaft and 11C shaft form the basis of the benchmarking.
2015 BIECON/15/03 Wesizwe Bakubung mine Platinum A shaft logistic study re-evaluating the cage configuration of the Bakubung shafts.
2014 BIECON/14/52 RSV Palabora Copper Copper A series of simulation studies evaluating the additional workforce entering the mine (for the Lift II construction period) and the impact of that on mine gate control and shaft schedules.
2014 BIECON/14/49 Worley Parsons Walfi-Golpu Copper A comprehensive rock handlinglogistic study simulation of the FS & Update study indicating the critical logistic components.  The study evaluated alternative rock handling equipment for effectiveness.
2014 BIECON/14/48 Lonmin Engineering Services Platinum  
2014 BIECON/14/46 RSVSA Palabora Copper mine Copper A comprehensive logistic study for the PFS and FS for the Lift II project.  The study used continious improvement principles to succesfully implement monitoring of outputs.  
2014 BIECON/14/45 SibanyeGold Ikamva Shaft Gold A logistic study for the new 46/47 decline design.  
2014 BIECON/14/44 SibanyeGold Hlanganani shaft Gold A logistic study for the new decline system below 50-level.
2014 BIECON/14/42 AngloGold Ashanti Tau Tona mine Gold A Time and Motion study of the reef boring process on Tau Tona mine.  The study updated the AGA executives on the succesfulnes of the reef boring process implementation.
2014 BIECON/14/34 Impala Platinum 16 Shaft Platinum A benchmarking study considering all types of drill rigs used on the Impala operations.  Time and Motion studies on 16 shaft, 20 shaft and 11C shaft form the basis of the benchmarking.
2014 BIECON/14/29 Glencore Blinkpan colliery Coal Animation of the tip and conveyor integration for Blinkpan colliery.
2014 BIECON/14/28 AngloGold Ashanti Moab Khotsong mine Gold Determining the logistic constraints of the shaft.
2014 BIECON/14/26 Glencore Gloria mine Coal Animation of traffic congestion on the decline of Gloria mine.
2014 BIECON/14/25 Barrick Africa Bulyanhulu Gold Evaluating the impact of face shift availability for mining crews using self propelled personnel carriers while refurbishment of the shaft.
2014 BIECON/14/23 SibanyeGold Beisa Uranium A comprhensive logistic study considering rehabilitation requirements for Beisa shaft when upgrading existing haulages for the uranium mining resource.
2014 BIECON/14/19 Modikwa mine North/South 1 Platinum A time and motion study of face drilling during stoping operation considering the available face time.
2014 BIECON/14/15 AngloGold Ashanti ATIC Tau Tona mine Gold Modelling of the UHSB plant to evaluate the final design capability.
2014 BIECON/14/13 Gem Diamonds Ghaghoo mine Diamonds A logistic study considering various mining methods for the diamond mine in Botswana.
2014 BIECON/14/10 AEMFC Vlakfontein colliery Coal A simulation study considering trucking and hauling options for Vlakfontein mine using actual data measured on the system.
2014 BIECON/14/07 Modikwa mine North/South 1/South2 Platinum A comprhensive TMM requirements study for the three shafts of Modikwa mine to affect the effectiveness of the operations.
2014 BIECON/14/05 Bokoni Platinum Brakfontein shaft Platinum A surface material logistics study integrated with the decline material handling capability of Brakfontein shaft.
2013 BIECON/13/36 Lonmin Hossy shaft Platinum A comprehensive logistic study for the deepened mine.
2013 BIECON/13/35 RSVSA PMC Copper A simulation study of the rock handling infrastructure and equipmet for the Lift II project.  The study made recommendations to increase the decline conveyor throughput rates.
2013 BIECON/13/33 Goldfields SouthDeep mine Gold A workshop facilities layout simulation considering the life of mine requirements of the Twin shaft operations.
2013 BIECON/13/32 Wesizwe Bakubung mine Platinum Animation of 72-level shaft station and facility arrangements for executive level.
2013 BIECON/13/29 Amplats AmandelBult 5 shaft Platinum A logistic study on the surface personnel and material facility layouts.
2013 BIECON/13/28 SibanyeGold Beatrix 3 shaft Gold Rock flow simulation study of Beatrix 3 shaft when mining the bottom levels of the existing mine.
2013 BIECON/13/26 RandGold Resources Kibali mine Gold Rock flow simulation study for the FS evaluating the final design for the rock flow tramming level.
2013 BIECON/13/22 Fox Projects Fox Platinum A time and motion study on various developing cycles for Fox projects, which were used in a mine design criteria document for their client.
2013 BIECON/13/21 AngloGold Ashanti Mponeng mine Gold A detailed implementation simulation study to evaluate the impact of installing logistic elements on the Phase 1 decline mining the CL reef on Mponeng mine.
2013 BIECON/13/19 Wesizwe Bakubung mine Platinum A comprehensive logistic study for the FS of the mine.
2013 BIECON/13/15 Bokoni Platinum Middelpunt Hill Platinum A logistic study for phase 2 of the Middelpunt hill shaft.
2013 BIECON/13/13 RSV PMC Copper A comprehensive optimisation study on the personnel and material shaft activities.  The shaft needed to double the throughput of personnel and material for the Lift II project.
2013 BIECON/13/12 SibanyeGold Driefontein mine Gold A simulation study considering tramming strategies between a number of the Driefontein operation to No. 1 shaft.
2013 BIECON/13/08 Two River Platinum TRP Platinum A personnel bus optimisation study to align the bus schedules with the mine shaft schedules.
2013 BIECON/13/07 Bokoni Platinum Middelpunt Hill Platinum A comprhensive logistic study for future phases of Middelpunt Hill and brakfontein shafts.
2013 BIECON/13/03 African Barrick Gold Bulyanhulu Gold A comprhensive logistic simulation considering mining and logistic requirements of the life om mine.
2013 BIECON/13/01 AngloGold Ashanti SVP Ops Gold A time and motion study of the development cysles on three of AngloGold Ashanti's shafts to understand the performance of the development cycles before continious operations can be considered for the development crews.